home *** CD-ROM | disk | FTP | other *** search
/ Skunkware 5 / Skunkware 5.iso / tls / tls029.1.Z / tls029.1 / industry / 980 < prev    next >
Encoding:
Text File  |  1994-04-19  |  1.1 KB  |  23 lines

  1. INMASS II ╤ Materials Requirements Planning - MC Software, Inc.
  2.  
  3. KEYWORDS: manufacturing, Manufacturing                           , 916     
  4.  
  5. MRP is the key module to control all aspects of material management and rough
  6. cut capacity management. It supports just in time material flow. A Master
  7. Schedule is maintained where firm and planned order, sales forecasts and
  8. production plans can be entered into the schedule. The Master Schedule is
  9. updated from other modules so that there is tight control of inventory
  10. balances, purchase orders, and production. Orders are scheduled in need-date
  11. priority and it projects when inventory will be depleted and time-phases the
  12. reordering. The Full Pegging feature lets you quickly ``peg'' components back
  13. to their sales order number. There are many exception reports available. When
  14. used in conjunction with INMASS' multicompany capability, it provides a
  15. powerful tool for simulation. MRP integrates with Inventory, BOM, Order Entry,
  16. Job/WIP, and Purchasing. Custom reports can be generated by INQUIRE report
  17. writer.
  18.  
  19.  
  20. MC Software, Inc.
  21. Tel: (916) 928-0778
  22. Toll free: (800) 395-9227           
  23.